Saudi worker housing regulations

Every establishment with 20+ workers needs licensed housing that covers its Qiwa headcount. Here are the main rules, briefly.

Source: MOMAH Health, Technical and Safety Conditions Required in Group Housing for Individuals, and the Balady platform. Last reviewed:

Who must comply

  • Every establishment with 20+ workers, across all its branches.
  • Licensed housing has to cover the workforce registered on Qiwa.
  • Paying a housing allowance doesn't exempt you.

What happens without a licence

  • The Balady–Qiwa link flags the gap.
  • Qiwa services such as visas and worker transfers stop.
  • The commercial registration can be suspended.

The key numbers

Who must comply
Every establishment with 20+ workers
Bedroom area per person
4 m² minimum
Maximum per room
10 people
Sanitary sets
1 set (WC, basin, shower) per 8 people or fewer
Dining / rest area
0.7 m² per person
Licence term
1 year, renewable
Supervision
A full-time Saudi supervisor

Capacity comes from areas and facilities, not beds. A 24 m² net bedroom takes 6 people, not 10. Try the calculator

Licence vs housing proof certificate

Group-housing licence
Held by the owner or whole-building tenant. Proves the property is licensed at a set capacity.
Housing proof certificate
Issued by a company renting units inside a licensed property, with the licence holder's approval.
Part of a building
A licence can't be issued for part of a building.

Licensing track by city

Riyadh
Balady: Licensed through the Balady platform (Riyadh Municipality).
Khobar
Balady: Licensed through the Balady platform (Eastern Province Municipality).
Dammam
Balady / MODON: Balady inside the city; MODON's own services inside its industrial cities.
Jubail
TBD
Ras Al Khair
TBD

Licensing steps on Balady

  1. Sign in with National SSO and choose the group-housing licence service.
  2. Enter the location, property, deed or lease, and capacity.
  3. Upload your CR, deed or lease, photos, completion certificate and Civil Defense approval.
  4. The municipality checks the location rules and gives initial approval.
  5. You get 90 days to finish the requirements, then inspection and fees.

Sources

A guidance summary, not legal advice. Check the official text before acting.

Leave the licensing to us

We house your crew in licensed beds, matched to Qiwa from day one.

City

What your request needs

—
rooms minimum
—
sanitary sets
—
m² sleeping area
—
Licensing track

A first estimate, based on the official group-housing rules.

Add to it

We'll call you to confirm the details before anything else.

Every bed licensed on Balady or MODON, matched to your Qiwa headcount.